TEL:0755-26868777
Your current position:Home >> English Language Web

Measures of Shenzhen Municipality for the administration of gas engineering construction

date:2016-04-19

Chapter one is the first chapter
Article 1 in order to strengthen the gas project construction management to ensure quality of gas engineering, according to the provisions of the State Council's "construction quality management regulations", "Shenzhen Special Economic Zone Gas Management Regulations" and relevant laws and regulations, combined with the practical conditions of the Shenzhen City, these measures are formulated.
Second the term "gas projects" as mentioned in these Measures refers to the establishment, reconstruction and expansion of gas storage, transmission and distribution facilities and pipeline gas supply facilities, including:
(a) gas stations (including automobile gas filling stations, docks and transmission facilities construction projects (hereinafter referred to as a kind of Gas Engineering);
(two) gas pipeline construction project of municipal gas pipeline, gas station, single building and small courtyard
(hereinafter referred to as the two type of gas engineering).
Third construction units, prospecting units, design units, construction units, engineering supervision units responsible for the quality of the gas project.
Fourth city construction administration department is responsible for the construction of the city's gas engineering department, responsible for the city's two types of gas projects within the city and the supervision and management of construction projects. City Construction Engineering Quality Supervision Institutions (hereinafter referred to as quality supervision institutions) in the implementation of the quality supervision of such projects. District construction administrative departments responsible for the supervision and management of two types of gas engineering construction project. District quality supervision institutions to implement the quality supervision of the project.
Article 5 supporting the construction of pipeline gas facilities shall be with the principal part of the project design at the same time, also Gongchengbaojian, construction at the same time, checked and accepted, and delivered for use.
The second chapter is the survey, design, construction and supervision of gas engineering.
Sixth units in the city to undertake gas engineering survey, design, construction, supervision of business, must be in accordance with the provisions of the competent administrative departments of construction qualification examination, and obtain the corresponding qualification certificate. Gas engineering design, construction, supervision units should be approved in accordance with the business scope of the business scope of business.
Article 7 Where in the city engaged in gas engineering survey, design, construction, supervision of professional and technical personnel and skilled workers, must obtain construction administrative departments approved or legal provisions of the certificate before engaging in related work. Gas engineering design documents must be approved by the municipal construction administrative department of the gas engineering professional design personnel.
Eighth gas engineering survey, design, construction, supervision enterprises should strictly implement the national, provincial and municipal relevant laws, regulations and engineering construction mandatory technical standards, to undertake the responsibility of the quality of the gas project.
Two ninth types of gas engineering design, pipeline gas operating enterprises shall, in accordance with the requirements of the construction unit, in a timely manner to provide air source access point, as the original information of the project design.
Tenth gas engineering design documents should be provided for the reasonable use of the project.
Eleventh equipment and materials used in the construction of gas projects shall meet the national standards, industry standards and the requirements of the city's rescue and maintenance.
Article 12 gas engineering design documents approved by the construction administrative departments to review before implementation, the specific examination scope, content, procedure, institution in accordance with the city construction projects design document review of management practices.
Thirteenth construction units must establish and improve the construction quality responsibility system, strict process management, and make the quality inspection and record of concealed works. Concealed works in the hidden, must inform the construction, supervision units, quality supervision institutions. Without the signature of the supervision engineer, hidden works shall not be concealed, the project may not enter the next process of construction.
Fourteenth mandatory supervision system for gas projects, the construction unit must be entrusted with the supervision of the professional supervision of gas engineering quality supervision of the construction of the gas project implementation supervision.
The third chapter of the quality supervision and special inspection of gas engineering
Fifteenth quality supervision institutions shall, in strict accordance with the national, provincial and municipal relevant laws, regulations and engineering construction mandatory technical standards for the supervision of the quality of gas works.
Article 16 the quality supervision institutions shall qualification of gas engineering survey, design, construction, and supervision units and personnel qualification, quality behavior and with documents and data related to the engineering quality of supervision and inspection. The documents and materials relating to the quality of the project include: construction permits; design units, construction units, engineering supervision units qualification certificates and personnel posts; quality assurance, technical information, etc..
Seventeenth pipeline gas enterprises to participate in the two types of gas projects, the special inspection, the existence of gas projects to the special inspection organizations put forward opinions.
The fourth chapter is the transfer of gas works
Article 18 a pipeline gas enterprises as two types of gas engineering receiving, gas supply unit, should set clear transfer regulations, procedures and work time, reported to the municipal construction administrative departments after approval to social promulgation and implementation.
Two special acceptance of the twenty-ninth type of gas projects, the construction unit shall promptly in accordance with the provisions of the project will be transferred to the pipeline gas business enterprise. Transfer of works including physical and complete information on the completion of the project. Prior to the completion of the transfer, the construction unit commitment to the maintenance of the project, management responsibility, the occurrence of damage to their own responsibility for repair.
Article 20 the construction unit shall before gas to gas pipeline operating companies for the supply of the relevant procedures, the gas pipeline business enterprises should be in the construction unit completed gas project completion transfer and supply procedures immediately after the organization supply, shall not refuse

Copyright 2015, Shenzhen Shennan Gas Company Limited. All rights reserved. all rights reserved copy
Address: No. 3093, Nanshan Road, Shenzhen City, Tel: 0755-26690988 Fax: 0755-26868999